Frintelis

Published research

Road freight lane briefs

What real European road freight lanes actually cost, rebuilt element by element from fuel, driver, toll, asset and waiting cost — and set against the quotes carriers gave for the same work. Every figure is traceable to a stated input.

What is a should-cost model in road freight?

A should-cost model rebuilds what a transport movement ought to cost from its underlying cost drivers — fuel consumption and price, driver hours and labour base, tolls and crossings, vehicle depreciation, maintenance, insurance, overhead and margin — rather than observing what the market is currently paying. It is a bottom-up cost model, not a rate index.

In freight procurement the distinction matters. A rate benchmark tells a buyer where they sit against other shippers. A should-cost model tells them whether the price in front of them is explained by the cost of doing the work. The first supports a market argument; the second supports a cost argument, and it works on lanes with too little transaction data to benchmark at all.

The briefs

Germany · 2027 budgeting · EU 25 t Mega trailer

How much will German road freight cost in 2027?

No single number: +3.4% for last-mile portfolios, +2.6% for long haul, against a 2.7% CPI consensus. Why driver time rather than kilometres sets the increase, and what a flat CPI budget costs per €10m of spend.

September 2026 · Read the note →

Germany → United Kingdom · Mega trailer · 1,200 km

What does a Nuremberg–Birmingham Mega trailer actually cost?

Should-cost €2,921 per trip against four RFQ quotes spanning €2,875 to €3,950. Full cost breakdown, sensitivity testing, detention cost and the questions that follow.

September 2026 · Read the brief →

Next brief

If there is a lane, corridor or country cost base you would find useful, say so — it may well be next.

How the numbers are produced

Figures come from the Frintelis should-cost engine, using operator-entered lane inputs against a frozen European reference set covering fuel, labour, toll, asset, maintenance and overhead cost. Routing is OpenStreetMap / Valhalla on a truck profile, so distances, border crossings and toll segments reflect a road a 40-tonne vehicle can legally take.

The model is deterministic. Identical inputs return an identical result, every element traces back to a stated assumption, and the reference basis is dated. That is what makes a figure usable in a tender file rather than merely interesting.

Need this for your own lanes?

1 — Frintelis, the platform

Model your own lanes, run sensitivity testing, export briefs like these for your tender file. Currently in an invitation-only pilot.

Request pilot access

2 — Advisory: tender and cost-model support

Independent support for European road freight procurement, delivered by the person who built the engine behind these notes.

Gyorgy Sike — twenty years in logistics network design and transport category management across European manufacturing. Currently responsible for transport strategy and cost transparency across a 30+ site European production network. Previously Global Logistics Category Manager at Norsk Hydro's extrusion business, running tender programmes delivering 13–21% cost reduction across five European markets — and where the first road freight TCO models behind Frintelis were built. Earlier network design and lowest-landed-cost modelling at iQor and Jabil, covering forward and reverse flows across Europe and the Americas. MSc Economics (international trade and the EU), University of Miskolc.

Scope. Road freight, Europe. Full truckload and groupage, multi-site manufacturing and distribution networks. Not ocean, air or parcel.

Independent. Not a 4PL, not a broker, no carrier commissions and no revenue share on savings. The only thing being sold is the analysis.

Engagements are scoped to a single tender cycle or a defined lane set, remote across Europe. Working languages: English and Hungarian, German at working level. Get in touch and we can work out whether it fits.

Email Gyorgy Connect on LinkedIn